PPF & ceramic coating in Fullerton, CA
8 paint protection film and ceramic coating shops in Fullerton, ranked by Coating Atlas score on certification, published prices and the brands they use.
The top-ranked PPF shop in Fullerton is OC Tintz. For ceramic coating it is OC Tintz. A full front of PPF costs $2,000 here.
- Shops listed
- 8
- PPF full front
- from $2,000
- Ceramic, 3-year
- Ask for a quote
Top-ranked PPF shops in Fullerton
Ranked by Coating Atlas score. Featured shops are labelled and never change the ranking.
How much PPF and ceramic coating cost in Fullerton
Typical prices from shops that publish them, next to the California range:
| Service | Fullerton price | California | Time |
|---|---|---|---|
| PPF, partial front | $1,500 | $900–$1,450 | 1 day |
| PPF, full front | $2,000 | $1,800–$2,000 | 1–2 days |
| PPF, full body | $5,500 | $4,800–$5,900 | 3–5 days |
Nearby cities in the Los Angeles-Long Beach-Anaheim, CA area
Most installs take 1–3 days, so a shop near home or work is easier.
Vehicles Fullerton shops work on most
Fullerton PPF and ceramic coating FAQ
How much does PPF cost in Fullerton?
Shops in Fullerton that publish prices charge $2,000 for a full front, based on 1 shop.
How much does ceramic coating cost in Fullerton?
No Fullerton shop publishes ceramic coating prices yet. Ask for a written quote that names the product and coverage.
Who is the top-ranked PPF installer in Fullerton?
OC Tintz currently has the highest Coating Atlas score in Fullerton. Scores update when shop data changes and are never for sale.
Is PPF or ceramic coating better?
They do different jobs. PPF is a thick film that stops stone chips and light scratches. A ceramic coating is a thin hard layer that adds gloss and makes washing easier but won't stop chips. Many owners put PPF on the front of the car and coat the rest.
How long does installation take?
A full front usually takes 1–2 days and a full body 3–5 days, including time for the film to settle. Plan on 1–3 days. Most of that is washing, decontamination and polishing; the coating then needs 24–48 hours indoors to cure.




